{"id":17988,"date":"2017-01-11T18:24:15","date_gmt":"2017-01-12T01:24:15","guid":{"rendered":"https:\/\/www.boartlongyear.com\/?p=17988"},"modified":"2017-09-19T16:14:47","modified_gmt":"2017-09-19T22:14:47","slug":"semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5","status":"publish","type":"post","link":"https:\/\/www.boartlongyear.com\/fr\/insite\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\/","title":{"rendered":"Comment le forage semi-autonome pendant les pauses dans les lits d&#039;enfant et les changements de quart de travail a accru la productivit\u00e9 de 13,5%"},"content":{"rendered":"<section class=\"tcvpb_section_tc\">\n\t\t\n\t\t<div class=\"tcvpb_section_content\"><div class=\"tcvpb_container\"><div class=\"tcvpb_column_tc_span12\"><div  class=\"intro\" >\n<p class=\"p_tc\"><strong>9 Percent Increase in Six Month Average Meters Drilled<\/strong><br><em>Ever Increasing Safety and Productivity<\/em><\/p>\n<p class=\"p_tc\">Owned and operated by BHP Billiton, Olympic Dam is Australia\u2019s largest underground mine site with more than 450 kilometers (279 miles) of underground development. The underground mine produces 10 million tons of ore per year using the sublevel open stope mining method.<\/p>\n<\/div><\/div><\/div><\/div>\n\t\t\n\t\t\n\t<\/section><section class=\"tcvpb_section_tc\">\n\t\t\n\t\t<div class=\"tcvpb_section_content\"><div class=\"tcvpb_container\"><div class=\"tcvpb_column_tc_span6\"><div  class=\"\" >\n<p class=\"p_tc\">Boart Longyear has been working at Olympic Dam as part&nbsp;of a long term agreement with BHP Billiton. As the operation continues to grow, improved productivity and safety is demanded for exploitation of newly defined ore zones. Boart Longyear has answered this need by developing drilling technologies and methods for improved diamond core drilling.<\/p>\n<p class=\"p_tc\">The past introduction of rod-handlers, by Boart Longyear, reduced drilling contractors\u2019 exposure to the manual handling of rods, leading to limited occurrences of hand injuries. Boart Longyear also participated in a study involving rig-moves which resulted in improved site move time by 11 percent. Now Boart Longyear has developed and implemented the <a href=\"https:\/\/www.boartlongyear.com\/drilling-equipment\/underground-coring\/dci\/\" target=\"_blank\" rel=\"noopener noreferrer\">Drill Control Interface (DCi)<\/a> to increase the efficiency, productivity and safety of the LM\u2122 series of underground diamond core drill rigs.<\/p>\n<\/div><h2  ><span>The Challenge<\/span><\/h2><div  class=\"\" >\n<p class=\"p_tc\"><strong>Increase productivity of underground diamond core drilling<\/strong><\/p>\n<p class=\"p_tc\">Boart Longyear provides diamond core drilling services at&nbsp;the Olympic Dam mine site.&nbsp;Diamond drilling is used to extract rock samples (core) for analysis of the Olympic Dam ore body geometry and to collect geochemical information which will be used to create block models for planning and extraction of future resources.<\/p>\n<p class=\"p_tc\">Boart Longyear was able to introduce the <a href=\"https:\/\/www.boartlongyear.com\/drilling-equipment\/underground-coring\/dci\/\" target=\"_blank\" rel=\"noopener noreferrer\">DCi<\/a> to not only increase productivity, but to also enhance safety for the drilling contractors.<\/p>\n<\/div><h2  ><span>The Solution<\/span><\/h2><div  class=\"\" >\n<p class=\"p_tc\"><strong>DCi increases meters drilled<\/strong><\/p>\n<p class=\"p_tc\">Over a six month period (May \u2013 October 2013) Boart Longyear used an <a href=\"https:\/\/www.boartlongyear.com\/drilling-equipment\/underground-coring\/lm75\/\" target=\"_blank\" rel=\"noopener noreferrer\">LM\u212275<\/a> drill rig with the DCi to drill a total&nbsp;of 5,726.3 meters using a BQTK size diamond core bit. This was an increase of 907.7 meters drilled over the previous six month average, which resulted in a unit cost improvement of $2.90 per meter average and monthly productivity increase of 13.5 percent.<\/p>\n<\/div><\/div><div class=\"tcvpb_column_tc_span6 graysidecolumn tcvpb-inversed_text\" style=\"background-color:rgb(82, 88, 97);\"><div  class=\"\" >\n<table>\n<tbody>\n<tr>\n<td>Customer<\/td>\n<td><strong>BHP Billiton<\/strong><\/td>\n<\/tr>\n<tr>\n<td>Service<\/td>\n<td><strong>Underground Diamond Core Drilling<\/strong><\/td>\n<\/tr>\n<tr>\n<td>Location<\/td>\n<td><strong>Olympic Dam, South Australia<\/strong><\/td>\n<\/tr>\n<tr>\n<td>Application<\/td>\n<td><strong>LM\u212275 and Drill Control Interface\u2122 (DCi\u2122)<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div><div  class=\"tcvpb_divider tcvpb_divider_solid \"><a href=\"#\" class=\"backtotop\"><\/a><\/div><div  class=\"tcvpb-image \" ><img decoding=\"async\" src=\"https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-case-study-column-map.png\"><\/div><span class=\"clear\" style=\"height:20px;display:block;\"><\/span><div  class=\"\" >\n<p class=\"p_tc\"><strong>Vital Stats&nbsp;<\/strong><\/p>\n<ul>\n<li>908 meter improvement compared to historical six month average meters&nbsp;drilled<\/li>\n<li>AUD $2.90 average per meter unit cost improvement<\/li>\n<li>13.5 percent monthly productivity increase<\/li>\n<\/ul>\n<\/div><span class=\"clear\" style=\"height:20px;display:block;\"><\/span><div  class=\"tcvpb-image \" ><img decoding=\"async\" src=\"https:\/\/www.boartlongyear.com\/wp-content\/uploads\/2017\/01\/dci-manual-vs-auto-drill-meters-1.svg\"><\/div><\/div><\/div><\/div>\n\t\t\n\t\t\n\t<\/section><section class=\"tcvpb_section_tc\">\n\t\t\n\t\t<div class=\"tcvpb_section_content\"><div class=\"tcvpb_container\"><div class=\"tcvpb_column_tc_span8\"><span class=\"clear\" style=\"height:20px;display:block;\"><\/span><div  class=\"\" >\n<p class=\"p_tc\">With the deepest hole depth of 700 meters drilled on site, the <a href=\"https:\/\/www.boartlongyear.com\/drilling-equipment\/underground-coring\/dci\/\" target=\"_blank\" rel=\"noopener noreferrer\">DCi<\/a> allowed Boart Longyear to continue drilling during crib breaks and shift change over. This is possible because the DCi incorporates a programmable logic control (PLC) system where a supervisor can pre-set parameters for drilling. These parameters create a semi-autonomous drill system allowing the LM75 to achieve a three meter run in absence of a driller.<\/p>\n<p class=\"p_tc\">The DCi PLC system results in fewer hoses, less leaks and clutter around the drill. A supervisor can set drilling parameters for inexperienced operators and an auto shutdown will occur when a drill run ends or programmed parameters are exceeded. Also a laser proximity will shut down the rig when breached \u2014 keeping drillers at a safe distance at all times.<\/p>\n<\/div><\/div><div class=\"tcvpb_column_tc_span4\"><span class=\"clear\" style=\"height:20px;display:block;\"><\/span><div  class=\"tcvpb-image \" ><a href=\"https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-650x545.jpg\" class=\"lightbox\" data-lightbox=\"image\"><img decoding=\"async\" src=\"https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-650x545.jpg\">\n\t\t\t<canvas class=\"grey-effect\"><\/canvas>\n\t\t\t<i class=\"fa-arrows-alt\"><\/i>\n\t\t<\/a><\/div><\/div><\/div><\/div>\n\t\t\n\t\t\n\t<\/section><section class=\"tcvpb_section_tc\">\n\t\t\n\t\t<div class=\"tcvpb_section_content\"><div class=\"tcvpb_container\"><div class=\"tcvpb_column_tc_span12\"><div  class=\"\" >\n<p class=\"p_tc\">A fully electronic user interface means the <a href=\"https:\/\/www.boartlongyear.com\/drilling-equipment\/underground-coring\/dci\/\" target=\"_blank\" rel=\"noopener noreferrer\">DCi<\/a> has a lighter and more portable control cabinet compared to hydraulic controls. The 50 kilogram (110.23 lb) weight difference and the limited number of components allows drillers to move the unit easier and faster. There are only three plugs to disconnect from the DCi and no hydraulic hoses.<\/p>\n<p class=\"p_tc\">The PLC allows one push of a button for unattended drilling. By drilling within the pre-set parameters set by a supervisor, the <a href=\"https:\/\/www.boartlongyear.com\/drilling-equipment\/underground-coring\/lm75\/\" target=\"_blank\" rel=\"noopener noreferrer\">LM75<\/a> can achieve greater equipment life and greater productivity from inexperienced drillers. Also, an auto rod feed and pull system results in less manual handling and a hands-free wireline descent.<\/p>\n<p class=\"p_tc\">The DCi provides real time key performance data which is recorded, stored and easily downloaded for quick analysis. This current information allows a driller to make adjustments to the drill rig increasing productivity on the go. Because the DCi provides significant instrumentation data, a system diagnostic can be run to determine rig performance, operator performance and can detect early equipment failure.<\/p>\n<\/div><\/div><\/div><\/div>\n\t\t\n\t\t\n\t<\/section><section class=\"tcvpb_section_tc tendercta\" style=\"background-color:rgb(82, 88, 97);\">\n\t\t\n\t\t<div class=\"tcvpb_section_content\"><div class=\"tcvpb_container\"><div class=\"tcvpb_column_tc_span12\"><h1  ><span>WANT TO KNOW MORE?<\/span><\/h1><div  class=\"\" >\n<p class=\"p_tc\"><span style=\"color: #ffffff;\">Download the DCi <\/span><span style=\"color: #ffffff;\">technical overview PDF<\/span><\/p>\n<\/div><div  class=\"tcvpb-accordion \" data-expanded=\"0\">\n\t\t<h3>DOWNLOAD<\/h3>\n\t\t<div class=\"tcvpb-accordion-body\">\n\t\t\t\n<p class=\"p_tc\">[pardot-form height=\"770\" id=\"2399\" title=\"Download DCi Technical Brochure\"]<\/p>\n\n\t\t<\/div><\/div><\/div><\/div><\/div>\n\t\t\n\t\t\n\t<\/section><section class=\"tcvpb_section_tc\">\n\t\t\n\t\t<div class=\"tcvpb_section_content\"><div class=\"tcvpb_container\"><div class=\"tcvpb_column_tc_span12\"><div  class=\"medianote\" >\n<p class=\"p_tc\"><strong>Media Permission:<\/strong> Boart Longyear grants you immediate agency to republish this article. We request that you cite Boart Longyear as the source and provide a link back where appropriate.<\/p>\n<\/div><\/div><\/div><\/div>\n\t\t\n\t\t\n\t<\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":66,"featured_media":17990,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[137],"tags":[30,151,159,160,187],"class_list":["post-17988","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-exploration","tag-safety","tag-productivity","tag-drilling","tag-underground","tag-autonomous-drilling","insitetype-case-study","insitetype-safety-innovation"],"acf":[],"canto_acf_fields":"","yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How semi-autonomous drilling during crib breaks and shift change overs increased productivity by 13.5% - Boart Longyear<\/title>\n<meta name=\"description\" content=\"Australia\u2019s largest underground mine site saw a 9% increase in average meters drilled using semi-autonomous drilling with Boart Longyear&#039;s products.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.boartlongyear.com\/fr\/insite\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How semi-autonomous drilling during crib breaks and shift change overs increased productivity by 13.5%\" \/>\n<meta property=\"og:description\" content=\"With ever increasing safety and productivity parameters at mine sites, technology can be one of your best allies.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.boartlongyear.com\/fr\/insite\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\/\" \/>\n<meta property=\"og:site_name\" content=\"Boart Longyear\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/boartlongyearcareers\" \/>\n<meta property=\"article:published_time\" content=\"2017-01-12T01:24:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-09-19T22:14:47+00:00\" \/>\n<meta name=\"author\" content=\"Marketing\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Marketing\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/insite\\\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/insite\\\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\\\/\"},\"author\":{\"name\":\"Marketing\",\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/#\\\/schema\\\/person\\\/032374740a31823a2c24d24e33757727\"},\"headline\":\"How semi-autonomous drilling during crib breaks and shift change overs increased productivity by 13.5%\",\"datePublished\":\"2017-01-12T01:24:15+00:00\",\"dateModified\":\"2017-09-19T22:14:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/insite\\\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\\\/\"},\"wordCount\":1176,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/insite\\\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.boartlongyear.com\\\/wp-content\\\/uploads\\\/dci-underground.jpg\",\"keywords\":[\"Safety\",\"Productivity\",\"Drilling\",\"Underground\",\"autonomous drilling\"],\"articleSection\":[\"Exploration\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.boartlongyear.com\\\/insite\\\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/insite\\\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\\\/\",\"url\":\"https:\\\/\\\/www.boartlongyear.com\\\/insite\\\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\\\/\",\"name\":\"How semi-autonomous drilling during crib breaks and shift change overs increased productivity by 13.5% - Boart Longyear\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/insite\\\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/insite\\\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.boartlongyear.com\\\/wp-content\\\/uploads\\\/dci-underground.jpg\",\"datePublished\":\"2017-01-12T01:24:15+00:00\",\"dateModified\":\"2017-09-19T22:14:47+00:00\",\"description\":\"Australia\u2019s largest underground mine site saw a 9% increase in average meters drilled using semi-autonomous drilling with Boart Longyear's products.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/insite\\\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.boartlongyear.com\\\/insite\\\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/insite\\\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.boartlongyear.com\\\/wp-content\\\/uploads\\\/dci-underground.jpg\",\"contentUrl\":\"https:\\\/\\\/www.boartlongyear.com\\\/wp-content\\\/uploads\\\/dci-underground.jpg\",\"width\":1244,\"height\":829,\"caption\":\"DCI Underground semi-autonomous drilling\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/insite\\\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.boartlongyear.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How semi-autonomous drilling during crib breaks and shift change overs increased productivity by 13.5%\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/#website\",\"url\":\"https:\\\/\\\/www.boartlongyear.com\\\/\",\"name\":\"Boart Longyear\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.boartlongyear.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/#organization\",\"name\":\"Boart Longyear\",\"url\":\"https:\\\/\\\/www.boartlongyear.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.boartlongyear.com\\\/wp-content\\\/uploads\\\/BLY-Double-Stack.png\",\"contentUrl\":\"https:\\\/\\\/www.boartlongyear.com\\\/wp-content\\\/uploads\\\/BLY-Double-Stack.png\",\"width\":400,\"height\":100,\"caption\":\"Boart Longyear\"},\"image\":{\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/boartlongyearcareers\",\"https:\\\/\\\/x.com\\\/boartlongyear\",\"https:\\\/\\\/www.instagram.com\\\/boartlongyear\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/boart-longyear\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/BoartLongyear1\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.boartlongyear.com\\\/#\\\/schema\\\/person\\\/032374740a31823a2c24d24e33757727\",\"name\":\"Marketing\",\"url\":\"https:\\\/\\\/www.boartlongyear.com\\\/fr\\\/insite\\\/author\\\/jamesburris\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Comment le forage semi-autonome pendant les pauses dans les lits d&#039;enfant et les changements de postes a augment\u00e9 la productivit\u00e9 de 13,5% - Boart Longyear","description":"Le plus grand site minier souterrain d&#039;Australie a vu une augmentation de 9% du nombre moyen de m\u00e8tres for\u00e9s en utilisant un forage semi-autonome avec les produits de Boart Longyear.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.boartlongyear.com\/fr\/insite\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\/","og_locale":"fr_FR","og_type":"article","og_title":"How semi-autonomous drilling during crib breaks and shift change overs increased productivity by 13.5%","og_description":"With ever increasing safety and productivity parameters at mine sites, technology can be one of your best allies.","og_url":"https:\/\/www.boartlongyear.com\/fr\/insite\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\/","og_site_name":"Boart Longyear","article_publisher":"https:\/\/www.facebook.com\/boartlongyearcareers","article_published_time":"2017-01-12T01:24:15+00:00","article_modified_time":"2017-09-19T22:14:47+00:00","author":"Marketing","twitter_misc":{"\u00c9crit par":"Marketing","Dur\u00e9e de lecture estim\u00e9e":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.boartlongyear.com\/insite\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\/#article","isPartOf":{"@id":"https:\/\/www.boartlongyear.com\/insite\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\/"},"author":{"name":"Marketing","@id":"https:\/\/www.boartlongyear.com\/#\/schema\/person\/032374740a31823a2c24d24e33757727"},"headline":"How semi-autonomous drilling during crib breaks and shift change overs increased productivity by 13.5%","datePublished":"2017-01-12T01:24:15+00:00","dateModified":"2017-09-19T22:14:47+00:00","mainEntityOfPage":{"@id":"https:\/\/www.boartlongyear.com\/insite\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\/"},"wordCount":1176,"commentCount":0,"publisher":{"@id":"https:\/\/www.boartlongyear.com\/#organization"},"image":{"@id":"https:\/\/www.boartlongyear.com\/insite\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\/#primaryimage"},"thumbnailUrl":"https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-underground.jpg","keywords":["Safety","Productivity","Drilling","Underground","autonomous drilling"],"articleSection":["Exploration"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.boartlongyear.com\/insite\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.boartlongyear.com\/insite\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\/","url":"https:\/\/www.boartlongyear.com\/insite\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\/","name":"Comment le forage semi-autonome pendant les pauses dans les lits d&#039;enfant et les changements de postes a augment\u00e9 la productivit\u00e9 de 13,5% - Boart Longyear","isPartOf":{"@id":"https:\/\/www.boartlongyear.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.boartlongyear.com\/insite\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\/#primaryimage"},"image":{"@id":"https:\/\/www.boartlongyear.com\/insite\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\/#primaryimage"},"thumbnailUrl":"https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-underground.jpg","datePublished":"2017-01-12T01:24:15+00:00","dateModified":"2017-09-19T22:14:47+00:00","description":"Le plus grand site minier souterrain d&#039;Australie a vu une augmentation de 9% du nombre moyen de m\u00e8tres for\u00e9s en utilisant un forage semi-autonome avec les produits de Boart Longyear.","breadcrumb":{"@id":"https:\/\/www.boartlongyear.com\/insite\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.boartlongyear.com\/insite\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.boartlongyear.com\/insite\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\/#primaryimage","url":"https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-underground.jpg","contentUrl":"https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-underground.jpg","width":1244,"height":829,"caption":"DCI Underground semi-autonomous drilling"},{"@type":"BreadcrumbList","@id":"https:\/\/www.boartlongyear.com\/insite\/semi-autonomous-drilling-crib-breaks-shift-change-overs-increased-productivity-13-5\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.boartlongyear.com\/"},{"@type":"ListItem","position":2,"name":"How semi-autonomous drilling during crib breaks and shift change overs increased productivity by 13.5%"}]},{"@type":"WebSite","@id":"https:\/\/www.boartlongyear.com\/#website","url":"https:\/\/www.boartlongyear.com\/","name":"Boart Longyear","description":"","publisher":{"@id":"https:\/\/www.boartlongyear.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.boartlongyear.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/www.boartlongyear.com\/#organization","name":"Boart Longyear","url":"https:\/\/www.boartlongyear.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/www.boartlongyear.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.boartlongyear.com\/wp-content\/uploads\/BLY-Double-Stack.png","contentUrl":"https:\/\/www.boartlongyear.com\/wp-content\/uploads\/BLY-Double-Stack.png","width":400,"height":100,"caption":"Boart Longyear"},"image":{"@id":"https:\/\/www.boartlongyear.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/boartlongyearcareers","https:\/\/x.com\/boartlongyear","https:\/\/www.instagram.com\/boartlongyear","https:\/\/www.linkedin.com\/company\/boart-longyear","https:\/\/www.youtube.com\/user\/BoartLongyear1"]},{"@type":"Person","@id":"https:\/\/www.boartlongyear.com\/#\/schema\/person\/032374740a31823a2c24d24e33757727","name":"Commercialisation","url":"https:\/\/www.boartlongyear.com\/fr\/insite\/author\/jamesburris\/"}]}},"uagb_featured_image_src":{"full":["https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-underground.jpg",1244,829,false],"thumbnail":["https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-underground-200x200.jpg",200,200,true],"medium":["https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-underground-340x227.jpg",340,227,true],"medium_large":["https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-underground-768x512.jpg",640,427,true],"large":["https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-underground-1024x682.jpg",640,426,true],"RoboGalleryMansoryImagesCenter":["https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-underground.jpg",600,400,false],"RoboGalleryPreload":["https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-underground.jpg",100,67,false],"1536x1536":["https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-underground.jpg",1244,829,false],"2048x2048":["https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-underground.jpg",1244,829,false],"trp-custom-language-flag":["https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-underground.jpg",18,12,false],"alm-thumbnail":["https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-underground.jpg",150,100,false],"tptn_thumbnail":["https:\/\/www.boartlongyear.com\/wp-content\/uploads\/dci-underground.jpg",150,100,false]},"uagb_author_info":{"display_name":"Marketing","author_link":"https:\/\/www.boartlongyear.com\/fr\/insite\/author\/jamesburris\/"},"uagb_comment_info":3,"uagb_excerpt":null,"_links":{"self":[{"href":"https:\/\/www.boartlongyear.com\/fr\/wp-json\/wp\/v2\/posts\/17988","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.boartlongyear.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.boartlongyear.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.boartlongyear.com\/fr\/wp-json\/wp\/v2\/users\/66"}],"replies":[{"embeddable":true,"href":"https:\/\/www.boartlongyear.com\/fr\/wp-json\/wp\/v2\/comments?post=17988"}],"version-history":[{"count":0,"href":"https:\/\/www.boartlongyear.com\/fr\/wp-json\/wp\/v2\/posts\/17988\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.boartlongyear.com\/fr\/wp-json\/wp\/v2\/media\/17990"}],"wp:attachment":[{"href":"https:\/\/www.boartlongyear.com\/fr\/wp-json\/wp\/v2\/media?parent=17988"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.boartlongyear.com\/fr\/wp-json\/wp\/v2\/categories?post=17988"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.boartlongyear.com\/fr\/wp-json\/wp\/v2\/tags?post=17988"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}