The Globe and Mail | Pure Energy Minerals Completes Phase 3 Drill Program At Clayton Valley South Project, Nevada CV-8 Exceeds Target Depth To Over 3,000 Feet
February 07, 2017 - VANCOUVER, BC / TheNewswire / 07 Feb., 2017 - Pure Energy Minerals Limited is pleased to announce that exploration borehole CV-8 has been successfully drilled to a total depth of 3,194 ft (974 m) below ground level at its Clayton Valley South Lithium Brine Project, near Silver Peak, Nevada.